首页> 美国政府科技报告 >Pool-Type LMFBR Plant 1000 MWe Phase A-Extension-1 Design. Part II. Reactor Assembly: Structures. Sections 7-11. Interim Report
【24h】

Pool-Type LMFBR Plant 1000 MWe Phase A-Extension-1 Design. Part II. Reactor Assembly: Structures. Sections 7-11. Interim Report

机译:池式LmFBR装置1000 mWe a相扩展-1设计。第二部分。反应堆组件:结构。第7-11节。中期报告

获取原文

摘要

The Phase A effort produced an initial description of the overall plant, structures and systems. During Phase A, General Electric developed the overall nuclear steam supply system (NSSS) conceptual design. It defined specific design approaches for selected NSSS components and subsystems after analyzing various design alternatives. Bechtel assumed responsibility for the intermediate sodium piping arrangement, the access area above the reactor deck and the Balance of Plant (BOP). The resulting integrated plant design provided the necessary seismic data for both the NSSS and BOP. (ERA citation 04:013285)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号