首页> 美国政府科技报告 >Enlargement of the Raw Material Basis of Refineries by Including Hard Coal: Pilot Plant for Coal Hydrogenation, Construction Phase.
【24h】

Enlargement of the Raw Material Basis of Refineries by Including Hard Coal: Pilot Plant for Coal Hydrogenation, Construction Phase.

机译:包括硬煤在内的炼油厂原料基础的扩大:煤加氢中试装置,施工阶段。

获取原文

摘要

The design, construction and commissioning of a pilot plant for direct coal hydrogenation with a maximum coal throughput of 6 t/d is discussed. This plant is based on the proven IG-process. The design data for the modified process was experimentally obtained during laboratory scale investigations, including newly introduced process steps.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号