A pair of combustors and transition liners in a quarter-annular, direct-connect assembly was operated at temperatures up to 2400 degrees F to determine the feasibility of using production-type combustor systems as high-tmeperature gas generators for turbine-cooling studies. Operation at high temperatures for 32 hours was possible when minor liner modifications were made that provided greater cooling-air flow between the turbine casing and interior components.
展开▼