首页> 美国政府科技报告 >45-Day safety screening results for tank 241-U-102, push mode cores 143 and 144
【24h】

45-Day safety screening results for tank 241-U-102, push mode cores 143 and 144

机译:罐241-U-102,推模式芯143和144的45天安全检查结果

获取原文

摘要

This document is the 45-day report deliverable for tank 241-U-102 push mode core segments collected between April 16, 1996 and May 6, 1996 and received by the 222-S Laboratory between April 17, 1996 and May 8, 1996. The segments were subsampled and analyzed in accordance, with the Tank 241-U-102 Push Mode Core Sampling and analysis Plan (TSAP) (Hu, 1996) and the Safety Screening Data Quality Objective (DQO) (Dukelow, et al., 1995). The analytical results are included in Table 1. Attachment I is a cross reference to relate the tank farm identification numbers to the 222-S Laboratory LabCore sample numbers. The subsamples generated in the laboratory for analysis are identified in these diagrams with their sources shown. The diagram identifying the hydrostatic head fluid (HHF) blank is also included, Primary safety screening results and the raw data from Differential Scanning Calorimetry (DSC) and thermogravimetric analysis (TGA) analyses are included in this report. Two of the samples submitted for DSC analysis exceeded notification limits as stated in the Safety Screening DQO (Dukelow, et al., 1995). Cyanide analysis was requested on these samples and a Reactive System Screening Tool analysis was requested for the sample exhibiting the highest exothenn in accordance with the TSAP (Hu, 1996). The results for these analyses will be reported in a revision to this document.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号