Downhole Vibration Monitoring and Control System. Quarterly Progress Report No. 12. July 1, 2005 thru September 30, 2005

机译:井下振动监测与控制系统。 2005年7月1日至2005年9月30日第12号季度进展报告

获取原文

摘要

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. Work during this quarter centered on the rebuilding of the prototype using the improved valve design described in the Jan-March report1. Most of the components have been received and assembly was nearly complete at the end of the period. Testing started in October and results will be submitted in the next report. The field testing component of this Phase has been rethought. The current plan is to adapt the laboratory prototype for use in a drilling laboratory and run a series of controlled drilling tests with and without the DVMCS. This should give a more quantitative evaluation of its value, which will help us sign a commercialization partner. While this testing is underway, we will order and begin machining parts for full field prototypes to be use in Phase III. A modification application is being submitted in October to reflect these changes.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号