首页> 美国政府科技报告 >Downhole Vibration Monitoring and Control System Quarterly Progress Report No. 11. (April 1, 2005-June 30, 2005)
【24h】

Downhole Vibration Monitoring and Control System Quarterly Progress Report No. 11. (April 1, 2005-June 30, 2005)

机译:井下振动监测与控制系统季度进度报告第11号(2005年4月1日 - 2005年6月30日)

获取原文

摘要

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. Work during this quarter centered on the rebuilding of the prototype using the improved valve design described in the last report. Most of the components have been received and assembly has begun. Testing is expected to resume in August.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号