首页> 美国政府科技报告 >Fabrication process test evaluation: Shipping, HI-74-SL
【24h】

Fabrication process test evaluation: Shipping, HI-74-SL

机译:制造工艺测试评估:运输,HI-74-sL

获取原文

摘要

The test parts were canned on October 7, 1962 and October 8, 1963. Only six parts, all radiographic rejects, were used for the test instead of 12 parts as originally planned. The original test called for using one very porous and one relatively non-porous sand cast aluminum insert in each container. Shipping experience has shown no significant effect of porosity of inserts on corrosion severity of parts shipped in them. All inserts used were full contour support inserts. Each test part was canned in a separate container under conditions described in the process test. The shipping assemblies, were stored for 21 days and the parts removed and inspected on October 29, 1963. Colored photographs of the parts were taken on October 30, 1963.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号