RAG/STEAG Large Pilot Plant for the Catalytic Hydrogenation of Pit Coal

机译:RaG / sTEaG大型煤矿催化加氢中试装置

获取原文

摘要

The Ruhr Coal AG and Steag AG working within the framework of the ''Energy Technology Programme'' of the Land Nordrhein-Westfalen have undertaken the development to a commercially usable state of a coal hydrogenation process to produce coal oil based on a catalytic method. The project has evolved from preliminary studies and tests in the laboratory and on a technical scale up to the planning of a large pilot plant which is expected to go into operation in 1980 and have a coal throughput of 200 t (free of water and ash)/d. The IG process was further developed and optimized as a basis for the hydrogenation. The hydrogen used for hydrogenation is taken from a steam reformer plant operated with liquid gas. The processing plants consist of plants for coal preparation, hydrogenation, atmospheric distillation, vacuum distillation, pressure-releasing evaporation, residue disposal and furthermore of the ancillary plants for gas post-processing, process-water processing, and hydrogen generation and a series of operational means and side-plants. Optimization investigations on a technical scale are being done on the further processing of coal oil to chemical raw materials. (ERA citation 04:025167)

著录项

  • 作者

    Wolowski, E.;

  • 作者单位
  • 年度 1977
  • 页码 1-13
  • 总页数 13
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号