High Temperature Turbine Technology Program:Phase I. Topical Report. Phase III Preliminary Turbine sub-System Technology Readiness Verification Program Plan.

机译:高温涡轮技术计划:第一阶段专题报告。第三阶段初步涡轮机子系统技术准备验证计划计划。

获取原文

摘要

The ERDA High Temperature Turbine Technology Program has recognized that the most attractive system for using low Btu,coal-derived fuel gas and coal-derived liquid fuel is the combined cycle power plant,that gasification and liquefaction costs can be offset by increasing the gas-turbine efficiency through operation at higher turbine inlet temperatures. The overall objective of this program is to develop a high temperature turbine subsystem,for an open-cycle industrial gas turbine,which meets the following goals:operation at from 3000exp 0 F turbine inlet gas temperatures;utilization of low Btu gasified coal and coal-derived liquid fuels;and suitability for integration into a high efficiency,combined-cycle electric power generating plant. The program will be conducted in 3phases,over a 5year time span. The Phase I objective was to define the systems and the development efforts required during the Phase II ''Technology Testing and Support Studies''and the Phase III ''Verification Test Program''to bring these systems to technology readiness. Conceptual designs of commercial combined/cycle plants utilizing the coal-fueled high temperature turbine system were part of the Phase I effort. Selection of the turbine cooling concept and design definition of the high temperature turbine subsystem were also established. Progress in Phase I is reported. (ERA citation 03:044616)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号