GRID CONNECTED INTEGRATED COMMUNITY ENERGY SYSTEM Phase II, Final Stage 2 Report Outline Specifications of Cogeneration Plant

机译:网格连通集成社区能源系统第二阶段,最后阶段2报告热电厂的概要规范

获取原文

摘要

Estimates were separately made for General, Mechanical and Electrical Construction within each project design sub-task.nThe following capital cost budget summarizes the project cost content in each work category and for each project Option.nThe indicated total costs are for 1978 construction. Projected costs to 1981 assume annual escalation of 7%.nIt should be noted that Option I, Tunnel Construction and Lighting, was de¬signed and estimated by the University of Minnesota Engineering Department.