首页> 美国政府科技报告 >Improvements of Nuclear Fuel Management in Pressurized Water Reactors (PWR)
【24h】

Improvements of Nuclear Fuel Management in Pressurized Water Reactors (PWR)

机译:压水堆核电站管理改进(pWR)

获取原文

摘要

The severe variations to which the different elements contributing to the determination of the fuel cycle cost are subjected have led to a reopening of the problem of ''optimization'' of nuclear fuel management. The increase in costs of uranium ore, isotope separation work units (swu), reprocessing, the political implications of proliferation associated with the employment of reprocessing operations have been at the origin of a reassessment of present-day management. It therefore appeared to be appropriate to study variants with respect to a reference mode represented by the management of the PWR 900 MWe systems, without burnable poison in the cycle at equilibrium (Case 3 of Table 1). In order to obtain a complete view of impacts of such modifications, computations were carried out as far as the appraisal of the cycle cost and with reprocessing. There has likewise been added to this the estimate of the gain anticipated from certain improvements in the neutron balance contributed at the level of the lattice. (Atomindex citation 11:541776)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号