Coal Conversion Engineering Analysis for Central Hudson Gas and Electric Corporation, Danskammer Generating Station, Units 3 and 4. Final Report

机译:中央哈德逊燃气和电力公司煤炭转换工程分析,Danskammer发电站,3号和4号单元。最终报告

获取原文

摘要

The technical and economic feasibility of converting the Danskammer Power Plant at Roseton, NY from oil- to coal-firing was examined. This plant, built in 1950, was converted from coal- to oil-firing in 1971. Evaluation of the plant showed that oil-to-coal conversion is technically feasible, but modifications or additions to existing plant equipment would be required to meet coal handling needs and pollution control regulations. With no flue gas desulfurization equipment the 1980 cost of plant reconversion is estimated as $50.3 million. A FGD system would require an additional $40 million in direct costs. The total time estimated for engineering, construction, and licensing is 57 months. (ERA citation 05:034881)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号