首页> 外文期刊>NGW's Gas Market Reconnaissance >Hoosier Rural Electric Cooperative said it will close the 1,070-megawatt coal-fired Merom Generating Station in Sullivan County, Indiana, by 2023 as it moves to a generating mix that includes natural gas, wind, solar and battery storage.
【24h】

Hoosier Rural Electric Cooperative said it will close the 1,070-megawatt coal-fired Merom Generating Station in Sullivan County, Indiana, by 2023 as it moves to a generating mix that includes natural gas, wind, solar and battery storage.

机译:Hoosier农村电气合作社表示,它将在2023年将在Sullivan County,Indiana的1,070兆瓦燃煤Merom发电站接触到2023年,因为它移动到包括天然气,风,太阳能电池储存的发电机。

获取原文
获取原文并翻译 | 示例
       

摘要

The company said its plans are to reduce its carbon footprint by up to 80%. Hoosier Energy spokesman Greg Seiter said, "As far as the future of Merom goes, there are several future possibilities but no specific timeframe in place.
机译:该公司表示,其计划是将其碳足迹降低到80%。 Hoosier Energy Seepokesman Greg Seiter表示,“就未来的Merom来说,有几个未来的可能性,但没有具体的时间范围。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号