Blowdown Transients and Implication for Leak Protection Shutdown Strategy

机译:排污瞬态及其对泄漏保护停机策略的启示

获取原文

摘要

The creep-fatigue damage due to a blowdown transient is independent of the rate of water-side blowdown following isolation. The damage depends primarily upon plant system characteristics which set the rate of IHTS sodium cooldown after reactor scram and main pump trip. The time delay between a small leak alarm and reactor scram should be considered as a tradeoff between (1) providing time to confirm the existence of the leak to a reasonable level of assurance and (2) the potential for secondary tube wastage damage. In general, there appears to be no incentive to delay water-side blowdown following scram because the additional stress damage due to blowdown is insignificant and the potential for wastage damage should be eliminated as quickly as possible. One exception is the case of multiple evaporators feeding a superheater (as for CRBRP) where isolation and blowdown of one evaporator shortly after scram can cause significant additional stress damage to the superheater upper tubesheet. When initiated, the water-side blowdown process should be rapid. About 30 seconds blowdown time appears practical and adequate, based on the CRBRP design. (ERA citation 06:034846)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号