首页> 美国政府科技报告 >Review of Draft HTGR-SC/C Design and Technology Development Plans
【24h】

Review of Draft HTGR-SC/C Design and Technology Development Plans

机译:审查HTGR-sC / C设计和技术发展计划草案

获取原文

摘要

GCRA has approached the initial review of the subject plans from the vantage of Utility/User interests in an HTGR-SC/C Lead Project as characterized in the HTGR-SC/C Lead Project Plan. At their current stage of development, the plans are considered to represent the early views of General Atomic Company, acting as a potential NSSS vendor, on the effort necessary to design and license an HTGR-SC/C plant. As such, these plans embody GA's perception of the level of technical development and demonstration needed to support the cost and risk sharing assumptions in the Lead Project Plan. These plans and the plant design which they address will be subjected to a more formal review by other vendor and Utility interests in the course of establishing the Project Decision Package scheduled for June 1982. The culmination of these review activities will be the adoption of this information by all participants as the HTGR-SC/C Program Baseline.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号