首页> 美国政府科技报告 >Operation of WPPSS Nuclear Project No. 2. Docket No. 50-397, Washington Public Power Supply System
【24h】

Operation of WPPSS Nuclear Project No. 2. Docket No. 50-397, Washington Public Power Supply System

机译:Wppss核项目的运作第2号。案卷号50-397,华盛顿公共供电系统

获取原文

摘要

The information in this Final Environmental Statement is the second assessment of the environmental impact associated with the construction and operation of the Washington Public Power Supply System Nuclear Project No. 2, located in the State of Washington, County of Benton, near the City of Richland. The first assessment was the Final Environmental Statement related to the construction issued in December 1972, prior to the issuance of the construction permit. The station construction is now 86 percent complete. Fuel loading is scheduled for September 1983. The present assessment is the result of the NRC staff review of the activities associated with the proposed operation of the station.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号