首页> 美国政府科技报告 >Operating Experience with the Natural Bridges National Monument Photovoltaic Power System.
【24h】

Operating Experience with the Natural Bridges National Monument Photovoltaic Power System.

机译:天然桥国家纪念碑光伏发电系统的运行经验。

获取原文

摘要

The 100-kW photovoltaic power system at Natural Bridges National Monument in southwestern Utah has been in operation since May 1980. A comparison of system simulation with actual operation has been performed, good agreement has been found, and results are presented. In addition, conservation measures and their benefits are described. Operating experience with the system is presented, including measured component performance of the arrays, batteries, inverters, and system overhead loads. (ERA citation 06:021818)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号