首页> 美国政府科技报告 >City of Idaho Falls Low-Head Hydroelectric Demonstration Project. Emergency Action Plan.
【24h】

City of Idaho Falls Low-Head Hydroelectric Demonstration Project. Emergency Action Plan.

机译:爱达荷市瀑布低头水电示范项目。紧急行动计划。

获取原文

摘要

The City of Idaho Falls, Idaho is nearing completion of its Bulb Turbine Project which consists of three plants: City Plant, Lower Plant, and Upper Plant. These three plant sites are located on a seven mile stretch of the Snake River. The three projects will channel water through Voest Alpine bulb turbines powering Hitachi generators. The generating facilities will have a capacity of 8000 kW each, and produce a total of 170 million kWh per year. The design flow and head at each site are 6000 cfs and 19 ft respectively. Additionally, the City has two old 1.5 MW vertical shaft units at the Lower Plant which have been retained as peaking units when sufficient flows are available. The power plants will be unmanned, and controlled by SCADA equipment from a Central Control Building. The Central Control Building will be manned 24 hr a day by a generation operator. The City of Idaho Falls is hereby applying to FERC for an exemption from filing an emergency action plan. After reviewing probable modes of failure, the emergency hazard potential, and the impacts from probable failure, the City has concluded that no reasonably foreseeable project emergency would endanger life, health or property, based upon the information contained herein. (ERA citation 07:062818)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号