首页> 美国政府科技报告 >Combination of the Primary and Secondary Stress Components for Piping Systems (PWR; BWR)
【24h】

Combination of the Primary and Secondary Stress Components for Piping Systems (PWR; BWR)

机译:管道系统的主要和次要应力组件的组合(pWR; BWR)

获取原文

摘要

The present study considers several typical piping models subjected to distinct support motions. The independent time history analysis yields both primary stresses due to inertia and secondary stresses due to relative support motions. In addition, this analysis predicts the total response due to both effects. These results presumably are the best estimate of the actual response of a piping system subjected to a real earthquake because the analysis involves solving the system equations at every time step and the phasing during the process of solution is not lost. The piping models were then analyzed using the response spectrum method to obtain the maximum primary stresses. The secondary stresses were next calculated by performing a set of static analysis which result in the most unfavorable combination. These two results are combined by both SRSS and absolute sum methods and the results are compared with the time history solutions. (ERA citation 08:040843)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号