首页> 美国政府科技报告 >Raft River 5MW(E) Binary Geothermal-Electric Power Plant: Operation and Performance
【24h】

Raft River 5MW(E) Binary Geothermal-Electric Power Plant: Operation and Performance

机译:筏河5mW(E)二元地热发电厂:运行和性能

获取原文

摘要

A 5MW(e) Pilot Geothermal Power Plant was built at Raft River, Idaho, as an integral part of the Department of Energy's plan for commercial development of geothermal energy. The purpose of the plant was to investigate the technical feasibility of utilizing a moderate temperature hydrothermal resource (275 to 300 exp 0 F) to generate electrical power in an environmentally acceptable manner. The plant used a dual-boiling binary cycle with isobutane as the working fluid, and drew thermal energy from a 280 exp 0 F liquid-dominated resource. This paper presents the results of that testing, comparing the system performance to the performance predicted prior to operation along with a summary of operational experience. (ERA citation 09:002163)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号