City of El Centro Geothermal Energy Utility Core Field Experiment. Final Report, February 16, 1979-November 30, 1984

机译:埃尔森特罗地热能源公用事业核心实验城。最终报告,1979年2月16日至1984年11月30日

获取原文

摘要

The City of El Centro was awarded a contract in late 1978 to cost share the development of a low to moderate temperature geothermal resource in the City. The resource would be utilized to heat, cool and provide hot water to the nearby Community Center. In December 1981, Thermal 1 (injector) was drilled to 3970 feet. In January 1982, Thermal 2 (producer) was drilled to 8510 feet. Before testing began, fill migrated into both wells. Both wells were cleaned out. A pump was installed in the producer, but migration of fill again into the injector precluded injection of produced fluid. A short term production test was undertaken and results analyzed. Based upon the analysis, DOE decided that the well was not useful for commercial production due to a low flow rate, the potential problems of continued sanding and gasing, and the requirement to lower the pump setting depth and the associated costs of pumping. There was no commercial user found to take over the wells. Therefore, the wells were plugged and abandoned. The site was restored to its original condition. (ERA citation 10:018262)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号