首页> 美国政府科技报告 >Cape Blanco Wind Farm Feasibility Study. Technical Report No. 9. Socioeconomics
【24h】

Cape Blanco Wind Farm Feasibility Study. Technical Report No. 9. Socioeconomics

机译:Cape Blanco风电场可行性研究。技术报告第9号。社会经济学

获取原文

摘要

The socioeconomic impacts of a proposed wind farm at Cape Blanco, Oregon were assessed within the context of Curry County and, more specifically, Port Orford. The proposed 80-MW wind farm consists of installing either 455 units of FloWind 170-kW turbines or 31 units of Boeing MOD-2 turbines. Positive impacts are expected to occur during the on-year construction period. Local workers are expected to fill approximately 45 jobs for the Boeing alternative and 155 for the FloWind. The expenditures of nonlocal construction workers, estimated at $2.6 million (1984 dollars) for the Boeing and at $0.5 million (1984 dollars) for the FloWind, would contribute to increased revenues in the trade and services sectors of Port Orford. The construction workers for the FloWind alternative are expected to use primarily motels and trailer parks for their housing accommodations. Since there could be a shortage of temporary housing, particularly during the summer months, rental housing might need to be used. The demand for temporary housing, however, is not expected to displace tourists. If the Boeing alternative were selected, the construction contractor might need to provide worker housing to alleviate the demand for housing in Port Orford. (ERA citation 11:047452)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号