首页> 美国政府科技报告 >Nuclear Plant Piping Criteria and Construction Costs
【24h】

Nuclear Plant Piping Criteria and Construction Costs

机译:核电厂管道标准和建设成本

获取原文

摘要

The objectives of this study were to:(1) answer on a limited basis, why cost increases associated with the construction of nuclear power piping and supports have occurred, (2) provide a mechanism for utilities to track and assess the cost impact of Code and Regulatory additions and revisions related to piping criteria.nThe cost study was performed by reviewing nuclear piping installation costs for three units at a single site with a commercial operation date range of 16 years between Units 1 and 3. A number of conclusions are reached, the most important of which are:n• Craft labor hours for piping installation today can, and have been controlled to a degree that is competitive with plants constructed in the late 1960's.n• The overall piping and support cost increase factor per megawatt (corrected for inflation) from Unit 1 to Unit 3 is 1.76.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号