首页> 美国政府科技报告 >Precise Leveling Determination of Surface Uplift Patterns at the New Hydraulic Fracturing Facility, Oak Ridge National Laboratory
【24h】

Precise Leveling Determination of Surface Uplift Patterns at the New Hydraulic Fracturing Facility, Oak Ridge National Laboratory

机译:橡树岭国家实验室新水力压裂设施表面隆起模式的精确找平

获取原文

摘要

Surface uplift patterns were determined for five grout injections at the New Hydrofracture Facility (NHF) during the period July 1983 through January 1984. The uplift patterns are complex. In plan view, they are elliptical to almost circular and exhibit varying degrees of cross-sectional asymmetry with one side steeper than the other. The long axis of the ellipse is more or less parallel to geological strike. The uplift patterns vary in size, shape and asymmetry from injection to injection. The region of maximum uplift is typically offset with respect to the injection point, suggesting that most hydrofracture injections dip to the south-southeast. Approximately 40 to 60% of the uplift measured 5 days after an injection subsided within 30 to 45 days. In one case, all of the uplift subsided within 70 days of injection. Modeling of the uplift patterns by simple models, based on homogeneous, isotropic subsurface conditions, suggests that hydrofractures produced by the injections are either horizontal or have shallow dips to the south-southeast. Such orientations are consistent with the hydrofracture orientations determined by gamma-ray logging in observation wells surrounding the NHF site. 19 refs., 17 figs., 1 tab. (ERA citation 13:032331)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号