首页> 美国政府科技报告 >Building 774A Mini-Melter Restoration
【24h】

Building 774A Mini-Melter Restoration

机译:建造774a迷你熔化器修复

获取原文

摘要

Large scale mechanical improvements were made on the 100th scale glass melter in building 774A following a shutdown in November, 1988. The circumstances regarding that shutdown were reported by P.M. Allen in DPST-89-345. By request, the Mechanical Development Group assumed responsibility for the work on SRL Service order DS-87042. This report describes the changes which were made, their purpose, and observations as to their effectiveness after approximately 4 weeks of operating with the improvements in-place. Recommendations for further improving the equipment are also noted. The old melter design, now superseded, is documented in drawings ST5-23838 through ST5-23847. As-built drawing arrangements and details for the new work is shown in drawings SK5-6191-LD through SK5-6197-LD. Other design details are referenced in the drawings which were developed for the new shielded cells Research Melter, ST5-25111 through ST5-25124.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号