首页> 美国政府科技报告 >Allocation and Apportionment of Funding Resources for Military Construction Within the U.S. Army Reserve.
【24h】

Allocation and Apportionment of Funding Resources for Military Construction Within the U.S. Army Reserve.

机译:美军预备役军事建设资金配置与分配。

获取原文

摘要

The United States Army Reserve (USAR) apportions approximately 37 percent of the end strength of the total Army to fill the mission requirements necessary of the go to war Army. However, the total funding outlay provided to the Army Reserve MILCON program is a funded number not to exceed $70 million per annum, which is significantly less then the $10 billion given to the Active Component for support to the United States Army Corps of Engineers for MILCON. With the new Army vision and a need for a streamlined force tailored for both the regional conflict and in support of our war on terrorism. The Active Army force structure is likely to be reduced in size with a similar number of combat support and combat service support personnel shifting to the Reserve Components. Given this proportional shift in end strength, the USAR should be provided with a plus up in MILCON funding. Identifying the process, requirements and funding methodology currently utilized is the primary analysis utilized within this thesis and provides the justification for validation of USAR project requirements. The Active Army MILCON requirements alone seemingly outweigh the needs of the USAR force regardless, and investigation is aimed to point facts at this un-proportionality. This downward spiral is illogical given the current force structure and lobbying efforts ongoing within the active and reserve forces.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号