首页> 美国政府科技报告 >Dover Dam Physical Model Study, Tuscarawas River, Dover OH
【24h】

Dover Dam Physical Model Study, Tuscarawas River, Dover OH

机译:多佛大坝物理模型研究,Tuscarawas河,多佛OH

获取原文

摘要

Dover Dam is located on the Tuscarawas and Muskingum Rivers near Dover, OH. Based on data collected since the dam's original construction, it is possible that the dam will be overtopped by the Probable Maximum Flood. Several design alternatives are being considered to address this issue. A physical model study was conducted at the U.S. Army Engineer Research and Development Center, Coastal and Hydraulics Laboratory to collect data for use in a structural stability analysis. During the experiments, pressures were measured and potential erosion areas were noted. Forces exerted on the baffle blocks and stilling basin, as well as the potential undermining of the stilling basin were of major interest during the study.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号