首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Risley Reservoir Dam (CT 00211), Connecticut River Basin, Vernon & Bolton, Connecticut. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Risley Reservoir Dam (CT 00211), Connecticut River Basin, Vernon & Bolton, Connecticut. Phase I Inspection Report

机译:国家非联邦大坝检查计划。里斯利水库大坝(CT 00211),康涅狄格河流域,弗农和博尔顿,康涅狄格州。第一阶段检查报告

获取原文

摘要

The dam is located on a tributary of the Connecticut River on the town line of Bolton and Vernon, Tolland County, Connecticut. It is an earthfill structure approximately 625 ft. long with a maximum depth at its center of 26 ft. The crest width varies from 12 to 15 feet. A vertical granite masonry wall extends from the downstream side of the crest to the bed of Lydall Brook below. The visable part of the upstream embankment has a 1 on 2 to 1 on 3 slope with a riprap face. The downstream embankment consists of cobbles and boulders piled against the face of the masonry wall on an approximate 1 on 1.5 slope. The dam is in generally good condition. It appears to be structurally stable at the present time under normal conditions. Based on its small size and high hazard classification in accordance with the Corps' guidelines, the test flood is 1/2 the PMF. The spillway will pass only about 44 percent of the test flood and is considered inadequate. Recommendations to improve dam safety are: (1) Increase spillway capacity; (2) Replace 6-in. discharge pipe and relocate valve; (3) Add riprap near the center on the downstream side; (4) Divert spillway discharge away from the toe of the dam.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号