首页> 美国政府科技报告 >Concrete Deterioration in Spillway Warm-Water Chute, Raystown Dam, Pennsylvania
【24h】

Concrete Deterioration in Spillway Warm-Water Chute, Raystown Dam, Pennsylvania

机译:宾夕法尼亚州Raystown大坝溢洪道温水滑道的混凝土劣化

获取原文

摘要

The concrete in the walls and floor of the warm-water chute of the spillway of Raystown Dam, a relatively new structure (less than 10 years old), was showing an excessively rapid deterioration in quality. Surface concrete appeared extremely sandy and rough, resulting from an apparent dissolving away of cement paste and coarse aggregates. In addition to the surface problems, the walls separating the warm-water chute from the main spillway chutes contained interconnected voids, allowing water to flow under and through the walls. Several of these voids were large enough to reach inside. A limited sampling program provided concrete cores, aggregate, water, and efflorescence samples for chemical and petrographic analysis. A review of the pH history of the water in the reservoir was also conducted. The petrographic examination revealed that the surface concrete had been attacked by an aggressive liquid. Calculation of the Langlier Index for the reservoir water showed it to be aggressive to concrete. The pH history and the lack of evidence of introduction of acid into the reservoir, coupled with the chemical and petrographic evidence, led to the conclusion that the water itself was causing the surface damage. The voids in the walls were attributed jointly to poor consolidation of the concrete and design details which allowed the agressive water access to the interior of the walls. This is believed to be the first reported case of aggressive water attack on a concrete structure in the United States. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号