首页> 美国政府科技报告 >Installation Restoration Program. Phase II - Confirmation/Quantification. Stage 1 for American Lake Garden Tract, Washington
【24h】

Installation Restoration Program. Phase II - Confirmation/Quantification. Stage 1 for American Lake Garden Tract, Washington

机译:安装恢复计划。第二阶段 - 确认/量化。华盛顿美国湖花园道的第一阶段

获取原文

摘要

An IRP Phase II (Stage 1) Confirmation/Quantification Investigation was performed in the American Lake Garden Tract residential community as a consequence of previously confirmed groundwater contamination by like compounds both in the Garden Tract and on McChord AFB. A similar type of groundwater problem was believed to exist at the opposite end of the residential area, and may possibly be related to Army operations on Fort Lewis. The field study was designed to identify the type, quantity, and extent of groundwater contamination by expanding the study area to include all of the Garden tract, the entire west half of McChord AFB, and the northern one-third of the Fort Lewis Logistics Center. Field investigations consisted of 58,000 lineal feet of self-potential and 24,000 lineal feet of seismic refraction surveys. Forty electrical resistance stations were established. Twenty-six two-inch diameter monitoring wells were constructed. More than 225 water samples from more than 60 EPA, Army, and Air Force monitoring wells, plus domestic water supply wells were characterized for volatile organic chemicals. All wells were sounded at least weekly for static water levels, and in-situ hydrochemical properties were monitored. Study results confirm independent sources of chlorinated hydrocarbon contamination exist on each military facility, and that these contaminants are migrating into different parts of the American Lake Garden Tract.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号