首页> 美国政府科技报告 >Rocky Mountain Arsenal Northwest Boundary Containment/Treatment System Construction Report. Text, Drawings, Photos
【24h】

Rocky Mountain Arsenal Northwest Boundary Containment/Treatment System Construction Report. Text, Drawings, Photos

机译:落基山阿森纳西北边界遏制/处理系统建设报告。文字,图纸,照片

获取原文

摘要

The Northwest Boundary Project is located along the northwest boundary of Rocky Mountain Arsenal, Commerce City, Colorado. The system was constructed to contain and treat ground water which has been polluted with organic contaminants produced at the arsenal. The system consists of: 1) A Soil Bentonite cutoff barrier keyed into bedrock, 2) 15 dewatering wells, 3) 21 recharge wells, 4) 17 piezometers, and 5) a carbon adsorption treatment plant. Foundation explorations included soil borings, bedrock sampling, ground water hydrology testing, and bedrock and soil permeability tests. Investigations during construction included visually logging well cuttings, inspection of excavated slurry trench materials, blast hole drilling, and slurry and backfill testing. Keywords: Ground Water Hydrology; Permeability; Transmissivity; Organic Contaminant; Soil-Bentonite Cutoff Barrier; Carbon Adsorption; Dewater Wells; Recharge Wells; Bedrock; Excavation.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号