首页> 外文期刊>Petroleum Science and Technology >The Relationship Between the Production Rate and Initiation Location of New Fractures in a Refractured Well
【24h】

The Relationship Between the Production Rate and Initiation Location of New Fractures in a Refractured Well

机译:压裂井中新裂缝产生速率与起始位置的关系

获取原文
获取原文并翻译 | 示例
           

摘要

A reservoir model and a hydraulic fracture model are combined to describeof new fractures on well production. The finite difference method is used to solve governing equations and application software is developed to investigate influences of new fractures on pressure distribution within a flooding pattern and that of initiation location of new fractures on well production. The studies show that different initiation locations of new fractures in refracturing affects pressure distribution, especially around the fracture system. The accumulative well production decreases slowly when the new fracture initiates at the old fracture within 10 m from the well bore but with an increasing rate when 10 m is exceeded. It is suggested that the initiation location of new fractures in refracturing be controlled within 10 m of the well bore with engineering efforts.
机译:结合油藏模型和水力压裂模型描述了油井生产中的新裂缝。用有限差分法求解控制方程,并开发应用软件来研究新裂缝对注水模式内压力分布的影响以及新裂缝的起始位置对井产量的影响。研究表明,在压裂过程中,新裂缝的不同起始位置会影响压力分布,尤其是在裂缝系统周围。当新裂缝在距井眼10 m内的旧裂缝处开始时,累积的井产量会缓慢下降,但当超过10 m时,则井产量会以增加的速率增加。建议通过工程努力将新裂缝的起始位置控制在井眼10 m以内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号