ROLLER hearth furnaces (RHF) connect the casting section of thin slab casters such as the CSP (Compact Strip Production - an SMS technology) plant to the rolling mill. Although the thin slabs enter the RHF at an elevated temperature from the continuous caster they need to be further heated to the rolling temperature (typically 1050-1200 deg C depending on steel grade). For completing such a task a relatively short time is required - compared to the reheating time of a walking beam furnace which is normally charged with cold stock. The total length of a RHF needs to be longer than the minimum length necessary just for heating the slab as additional length is necessary corresponding to the length of the slab so it can be held in a soaking zone after the heating zone should a delay on the mill occur. In this way, while the continuous casting machines are feeding the RHF with thin slabs, it is possible to perform on-line maintenance at the finishing mill (such as roll changes). This otherwise empty space inside the RHF available for holding slabs during the mill stop (or the corresponding time available for filling up the furnace) is normally called the 'buffer' or 'buffer-time'. The buffer length required depends on the casting speed (which can be adjusted only within small limits) and the rolling speed. The target is to keep the length of the buffer as short as possible while being able to accommodate all the possible slabs in terms of their length, charging temperature, casting speed and rolling speed. This condition corresponds to the minimum RHF length for the required production mix while avoiding slowing down the continuous caster or even being forced to scrap slabs if the furnace becomes full.
机译:ROLLER炉膛炉(RHF)将薄板坯连铸机的铸造段(例如CSP(紧凑带材生产-SMS技术)工厂)连接到轧机。尽管薄板坯在连续铸造机的高温下进入RHF,它们仍需要进一步加热到轧制温度(根据钢种,通常为1050-1200℃)。为了完成这样的任务,与通常装有冷料的步进梁式炉的再加热时间相比,需要相对较短的时间。 RHF的总长度必须大于仅加热板坯所需的最小长度,因为与板坯长度相对应的附加长度是必需的,因此,如果加热区域延迟,可以将其保持在均热区中磨发生。这样,在连铸机向RHF输送薄板坯的同时,可以在精轧机上进行在线维护(例如换辊)。通常在RHF内部可用于在轧机停机期间(例如,可用于填满炉子的时间)固定板坯的空白空间称为“缓冲时间”或“缓冲时间”。所需的缓冲长度取决于铸造速度(只能在很小的范围内调整)和轧制速度。目标是保持缓冲器的长度尽可能短,同时在长度,装料温度,铸造速度和轧制速度方面能够容纳所有可能的板坯。此条件对应于所需生产混合物的最小RHF长度,同时避免了降低连铸机的速度,甚至避免在炉子变满时被迫废弃板坯。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号