首页> 外文期刊>Southwest Contractor >In the Wash/Las Vegas Wash Undergoes 12-year, 98 Million dollars Upgrade
【24h】

In the Wash/Las Vegas Wash Undergoes 12-year, 98 Million dollars Upgrade

机译:在Wash / Las Vegas Wash进行为期12年的9800万美元升级

获取原文
获取原文并翻译 | 示例
       

摘要

Las Vegas Wash, the carotiod artery of southern Nevada's water supply system, is undergoing a 12-year, 98 million dollars upgrade. Essentially, storm runoff flows into the 14-mi.-long wash, which empties into Lake Mead, the Las Vegas Valley's main source for drinking water. The wash can carry more than 150 million gallons of water daily. Problem is, severe flash floods and neglect have eroded the wash, passing sediment and debris into Lake Mead. "If we don't do something to stabilize the wash, 2.5 million tons of sentiment could erode over the next 20 years," said Neil Laudati, spokesman for the Las Vegas Valley Water District. "That's enough dirt to fill a football field 90 stories tall."
机译:内华达州南部供水系统的枢纽动脉Las Vegas Wash正在进行为期12年,耗资9800万美元的升级。本质上,暴雨径流流入14英里长的冲刷区,然后排入米德湖,这是拉斯维加斯山谷的主要饮用水来源。该清洗每天可携带超过1.5亿加仑的水。问题是,严重的山洪暴发和疏忽侵蚀了河水,使沉积物和碎屑进入米德湖。拉斯维加斯谷水区发言人尼尔·劳达蒂说:“如果我们不采取任何措施稳定水流,在未来20年中,可能会侵蚀250万吨的情绪。” “这足以填满一个高90层的足球场。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号