首页> 外文期刊>Skillings Mining Review >Rio Tinto Expanding Yandi Iron Ore, Dampier Port
【24h】

Rio Tinto Expanding Yandi Iron Ore, Dampier Port

机译:力拓扩张丹迪尔港的延迪铁矿

获取原文
获取原文并翻译 | 示例
           

摘要

Rio Tinto plc, London and Melbourne, announced in mid-October it would spend 1.35 billion US dollars on further expansion of its wholly owned Hamersley Iron's Pilbara region Yandicoogina mine and Dampier port in Western Australia. Expansion of the Yandicoogina mine will increase annual capacity from 36 million metric tons to 52 million metric tons at an estimated cost of 530 million US dollars. The mine was commissioned in 1998 at an initial rated capacity of 15 million metric tons a year. Since 1999 Hamersley progressively has increased its capacity, with the most recent expansion, from 24 to 36 million metric tons a year, completed this August.
机译:力拓(Rio Tinto)公司,伦敦和墨尔本于10月中旬宣布,将斥资13.5亿美元进一步扩大其全资拥有的哈默斯利钢铁公司的皮尔巴拉地区Yandicoogina矿和西澳大利亚州的丹皮尔港口。 Yandicoogina矿的扩建将使年产能从3600万吨增加到5200万吨,估计费用为5.3亿美元。该矿于1998年投产,初期额定年产能为1500万吨。自1999年以来,Hamersley逐步提高了产能,最近一次扩张是从今年8月的24吨增加到3600万吨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号