首页> 外文期刊>SAE International Journal of Aerospace >Grommet Hole Reinforcement and Lightning Strike Protection in Composite Structural Assembly
【24h】

Grommet Hole Reinforcement and Lightning Strike Protection in Composite Structural Assembly

机译:复合结构总成中的索环孔加固和雷击防护

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Aircraft design and assembly challenges include provision of hole protection from lightning strike in fastened joints, especially in the vicinity of fuel tanks or electrical services. Installation of interference fit fasteners helps minimize the effect of lightning strike and also enhances the durability and load transfer ability of the joint. However, these are known to cause laminate damage during installation which can degrade the fastener system performance. Use of a pre-installed expanded grommet into the hole prior to installing interference fit fasteners has been shown to greatly enhance the effectiveness of the joint as well as the conductivity of electrical current into the structure to minimize arcing or plasma discharge at the fastener in the event of lightning strike. The Fatigue Technology (FTI) GromEx system provides such hole protection for fastener installations into composites, allowing for the installation of interference fit fasteners without detrimental impact to the laminate. In a test program performed to evaluate the performance of the GromEx system under lightning strike testing, in accordance with the methods specified in SAE ARP 5416, it was found that interference fit fasteners, combined with the expanded grommets, eliminated gaps between the fastener and surrounding structure that could cause sparking during a lightning strike. These joints provide very low resistance between the fastening system and the structure and improved joint durability by more than four times. A description of the GromEx installation process, the structural benefits afforded by the GromEx system as well as the results of lightning strike simulated direct strike tests on complete tanks or tank Sections for a Zone 1A environment, are discussed in this paper.
机译:飞机设计和组装方面的挑战包括在紧固的接头处(特别是在燃油箱或电气服务附近)提供防雷击孔保护。过盈配合紧固件的安装有助于最大程度地减少雷击的影响,并增强接头的耐用性和载荷传递能力。但是,已知这些会在安装过程中造成层压板损坏,这可能会降低紧固件系统的性能。已显示在安装过盈配合紧固件之前在孔中使用预安装的膨胀垫圈,可以大大提高接头的有效性,并提高进入结构的电流传导率,以最大程度地减少紧固件中的电弧或等离子放电。雷击事件。疲劳技术(FTI)GromEx系统为紧固件在复合材料中的安装提供了这种孔保护,从而允许过盈配合紧固件的安装而不会对层压板产生不利影响。根据SAE ARP 5416中指定的方法,在雷电测试下执行的评估GromEx系统性能的测试程序中,发现过盈配合的紧固件与膨胀的索环相结合,消除了紧固件与周围环境之间的缝隙可能导致雷击时产生火花的结构。这些接头在紧固系统和结构之间提供了非常低的阻力,并且接头的耐用性提高了四倍以上。本文讨论了GromEx安装过程,GromEx系统提供的结构优势以及针对1A区环境的完整储罐或储罐截面的雷击模拟直接打击测试的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号