...
首页> 外文期刊>San Joaquin Agricultural Law Review >UN-JUST COMPENSATION: HOWSEVERANCE DAMAGES AND INVERSE CONDEMNATION WILL AFFECT CALIFORNIA HIGH-SPEED RAIL TAKINGS
【24h】

UN-JUST COMPENSATION: HOWSEVERANCE DAMAGES AND INVERSE CONDEMNATION WILL AFFECT CALIFORNIA HIGH-SPEED RAIL TAKINGS

机译:非同寻常的赔偿:过分的损害和反向定罪将影响加利福尼亚州的高速铁路运输

获取原文
获取原文并翻译 | 示例

摘要

California may soon face a showdown between the construction of modern day technology and the farms that have enriched the state for many years. The California High-Speed Rail system is quickly becoming a reality, with the first section of tracks, between Fresno and Bakers-field, scheduled to begin construction in 2012.1 This section alone is slated to cost an estimated $5.5 billion.2 The California High-Speed Rail line is set to dislocate approximately 1,900 acres of land between Merced and Bakersfield.3 Of this property, roughly 1,460 acres are farmland.4 Land that lies where rail routes are proposed will likely have to be acquired by the California Rail Authority ("Rail Authority") in order to begin construction.5 For land that will remain in private hands, nearly 2,445 to 3,860 acres of farmland state-wide listed as prime, important, or unique that will be affected by the project, the long-term effects of the project have come into great contention due to the extraordinary noise and vibration created by high-speed trains.
机译:加州可能很快就会面临现代技术的建设与多年来丰富了该州的农场之间的对决。加利福尼亚州高铁系统正在迅速成为现实,第一段铁轨位于弗雷斯诺和贝克斯场之间,计划于2012年开始施工。1仅此部分的造价估计就达55亿美元。2高速铁路线预计将在Merced和Bakersfield之间迁移约1900英亩土地。3该物业中,约有1,460英亩为农田。4提议铁路路线的土地可能必须由加利福尼亚州铁路管理局(California Rail Authority)收购(“铁路管理局”),以便开始施工。5对于长期将由私人持有的土地,该州范围内将有近2,445至3,860英亩的农田被列为主要,重要或独特的受项目影响的长期土地由于高速列车产生的巨大噪音和振动,该项目的效果引起了极大的争议。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号