首页> 外文期刊>Oil Review Middle East >Middle East Tubular Services wins Iraqi West Qurna Phase II Oilfield contract
【24h】

Middle East Tubular Services wins Iraqi West Qurna Phase II Oilfield contract

机译:中东管道服务赢得伊拉克西古尔纳二期油田合同

获取原文
获取原文并翻译 | 示例
       

摘要

MIDDLE EAST TUBULAR Services (METS) has been awarded a contract to carry out inspection and machine shop services for Lukoil Middle East on its West Qurna Phase II Oilfield requirements in Iraq. The Iraq branch of the business, METS Khor Al Zubair, has entered into a three year service contract with the upstream oil company, which will see it carry out thread and pipe body inspection on tubing from Lukoil's site. METS regional manager Gareth McMurray said, "Between now and December we are looking at transporting and inspecting 7,000 joints with threading repairs being carried out on those with damaged connections." METS, which provides the oil and gas industry with storage, handling, logistics, repair and accessory manufacturing of oil country tubular goods (OCTG), began operations on its 52,000 sq m Basra free zone site in 2011. Other recent long-term service agreements in Iraq include both a machine shop services contract and an OCTG inspection services contract for BP Iraq on its Rumailah Oilfield, which are predicted to complete in 2014 and 2015 respectively.
机译:中东管道服务公司(METS)已获得一份合同,根据卢克石油中东公司在伊拉克的西库尔纳二期油田的要求为中东石油公司提供检查和加工车间服务。业务的伊拉克分支机构METS Khor Al Zubair已与上游石油公司签订了为期三年的服务合同,该公司将在卢克石油公司现场对油管进行螺纹和管体检查。 METS区域经理Gareth McMurray表示:“从现在到12月,我们正在考虑运输和检查7,000个接头,并对那些损坏连接的接头进行螺纹修复。” METS为石油和天然气行业提供石油国家管状物品(OCTG)的存储,处理,物流,维修和配件制造,其于2011年在其52,000平方米的巴士拉自由区基地开始运营。其他近期的长期服务协议伊拉克的石油包括BP伊拉克鲁迈拉油田的BP机加工厂服务合同和OCTG检查服务合同,预计分别在2014年和2015年完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号