首页> 外文期刊>Oil review Africa >Double bolckage facilitates pipeline replacement
【24h】

Double bolckage facilitates pipeline replacement

机译:双重螺栓便于管道更换

获取原文
获取原文并翻译 | 示例
       

摘要

TD WILLLIAMSON HAS completed the first-ever subsea STOPPLE Train isolation. The patented STOPPLE Train plugging system links two plugging heads into a "train" capable of providing the added assurance of double block at each isolation point. The double isolation was performed in about 18 m of water in the Gulf of Mexico to facilitate abandonment and decommissioning of an old platform.
机译:TD威廉姆森(TD WILLLIAMSON)已经完成了有史以来的首次海底STOPPLE列车隔离。获得专利的STOPPLE Train堵头系统将两个堵头连接成一个“火车头”,该火车头能够在每个隔离点提供双重阻隔的附加保证。双重隔离是在墨西哥湾约18 m的水中进行的,以促进旧平台的废弃和退役。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号