...
首页> 外文期刊>Oil Asia >MOSES Minimizes Redundant Steel in ORCA Offshore's Analysis of Self-installing Platform
【24h】

MOSES Minimizes Redundant Steel in ORCA Offshore's Analysis of Self-installing Platform

机译:MOSES在ORCA Offshore自安装平台分析中将冗余钢的含量降至最低

获取原文
获取原文并翻译 | 示例

摘要

When Centrica acquired the F3-FA field in the Dutch sector of the North Sea, it planned to develop the field for four years of production and then relocate to another field. A EUR 200 million reusable platform was crucial to the project's success. ORCA Offshore joined a team of design, fabrication, and installation contractors to provide the naval architectural analysis for transport and installation of the nearly 9,000-ton, self-installing platform. ORCA Offshore provided motion and stability analysis, multibody dynamic analysis, structural spectral analysis, and scale model testing. Bentley's MOSES offshore platform design and installation software simulated and analyzed the transportation and installation of the unique production platform.
机译:Centrica收购了北海荷兰地区的F3-FA油田后,计划将该油田开发四年,然后转移到另一个油田。一个价值2亿欧元的可重用平台对项目的成功至关重要。 ORCA Offshore与设计,制造和安装承包商团队一起,为近9000吨的自安装平台的运输和安装提供了海军建筑分析。 ORCA Offshore提供了运动和稳定性分析,多体动力学分析,结构光谱分析和比例模型测试。 Bentley的MOSES海上平台设计和安装软件模拟并分析了独特生产平台的运输和安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号