首页> 外文期刊>Oil and Gas Reporter >Natural Gas Regulation: FERC Required Forms Administrative Law: Scope of Judicial Review: Rulemaking
【24h】

Natural Gas Regulation: FERC Required Forms Administrative Law: Scope of Judicial Review: Rulemaking

机译:天然气法规:FERC必填表格行政法:司法审查范围:规则制定

获取原文
获取原文并翻译 | 示例
       

摘要

In February 2007, FERC opens an inquiry to determine whether its extant financial forms are sufficient to provide information to the public about the pipeline's jurisdictional rates. FERC no longer reviews rates triennially as it once did and thus relies on investigations and complaints by third parties as the basis for any determination as to whether an existing rate is "unjust, unreasonable, unduly discriminatory or preferential." This leads to the FERC proposing and then changing its rules as to the forms that need to be filed by jurisdictional pipelines partially in order to deal with the issue of fuel costs being charged by the pipelines. A new schedule is added to Forms 2, 2-A, and 3-Q requiring pipelines to report detailed information regarding the acquisition and disposition of shipper-supplied gas. The petitioner participates in the rulemaking proceeding and
机译:2007年2月,FERC进行了一次调查,以确定其现有的财务形式是否足以向公众提供有关管道管辖权费率的信息。 FERC不再像以前那样每三年进行一次利率审查,因此依靠第三方的调查和投诉作为确定现有利率是“不公正,不合理,过分歧视或优惠”的基础。这导致FERC提出并随后更改了其管辖区管道需要部分填写的表格的规则,以便处理管道收取的燃料成本问题。在表格2、2-A和3-Q中添加了新的时间表,要求管道报告有关承运人提供的气体的获取和处置的详细信息。请愿人参加规则制定程序,

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号