首页> 外文期刊>Oil & Gas Eurasia >Rosneft Conducted Twenty-stage Fracking at Samotlor
【24h】

Rosneft Conducted Twenty-stage Fracking at Samotlor

机译:俄罗斯石油公司在萨莫特洛进行了20阶段压裂

获取原文
获取原文并翻译 | 示例
           

摘要

Rosneft has completed pilot project to drill new horizontal well with carrying out 20 stages of hydraulic fracturing (HF) at the Samotlor license area ("SNG" is the operator). The pilot well was drilled within 23 days, its horizontal section length amounted 510 meters, and the distance between frac ports amounted 24 meters. The flow rate of the drilled well was about 100 tons per day. Multi-stage hydraulic fracturing operations have been performed by Rosneft subsidiary RN-Fracturing LLC.
机译:Rosneft已完成在Samotlor许可区域进行20阶段水力压裂(HF)的新水平井钻探的试验项目(“ SNG”为运营商)。试井在23天内进行了钻探,水平段长度为510米,压裂孔之间的距离为24米。钻井的流量约为每天100吨。 Rosneft的子公司RN-Fracturing LLC已执行了多级水力压裂作业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号