首页> 外文期刊>Oil & Gas Eurasia >Odessa Refinery Puts Back in Operation
【24h】

Odessa Refinery Puts Back in Operation

机译:敖德萨精炼厂重新投入运营

获取原文
获取原文并翻译 | 示例
           

摘要

LUKOIL President Vagit Alekperov and President Victor Yushchenko of Ukraine attended the official ceremony of commissioning the Odessa refinery today as the reconstruction of the refinery,started in 2005,has been completed.In the course of the three-year effort,one of the AVT distillation units has been modernized,increasing its annual capacity from 2.4 million tons to 2.8 million tons,while the second such unit was put out of operation. The modernization also included the upgrading of the hydrotreatment unit and of several blocks of general equipment. Also,a visbreak-ing unit was installed.
机译:卢克石油公司总裁Vagit Alekperov和乌克兰总统Victor Yushchenko今天参加了敖德萨炼油厂的正式投产仪式,因为该炼油厂从2005年开始进行了重建,在三年的努力过程中,AVT蒸馏该装置已进行了现代化改造,将其年产能从240万吨增加到280万吨,而第二个此类装置已停产。现代化还包括加氢处理装置和几套常规设备的升级。另外,还安装了一个防粘装置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号