Merit Energy Co.has reported results of their successful horizontal redrill of the Walter & State Case 4-29B(SL:SW SE SE,Sec 29-T34N-R3E,Case Twp.,Presque Isle Co.)well,with the Case 29-34N-3E Niagaran reef producer coming back on at initial daily rates of 288 barrels oil,134 Mcf gas,and 7.5 barrels water upon completion of the HD-1 drain hole in early June 2006.
展开▼
机译:Merit Energy Co.已报告了成功的Walter&State Case 4-29B(SL:SW SE SE,Sec 29-T34N-R3E,Case Twp。,Presque Isle Co.)井水平再钻孔的结果,以及Case 29 -34N-3E尼亚加拉瓜礁石生产商于2006年6月上旬完成HD-1排水孔后,最初的日产量为288桶石油,134 Mcf天然气和7.5桶水。
展开▼