首页> 外文期刊>Oil & Gas Gazette >First test for Raven engineering play
【24h】

First test for Raven engineering play

机译:Raven工程游戏的首次测试

获取原文
获取原文并翻译 | 示例
           

摘要

PROMISING IT IS the first well in an extensive planned drilling program,Pryme Oil & Gas has spudded the Spinks-Middlebrooks 11-1 well,chasing a five billion cubic feet prospect within the large Raven project.Managing director Justin Pettett said 10 drilling locations had been identified in the project area already,potentially containing a gross 50 billion cubic feet.
机译:Pryme Oil&Gas已将Spinks-Middlebrooks 11-1井进行了钻探,在大型Raven项目中购买了50亿立方英尺的勘探井。已在项目区域中确定,可能包含500亿立方英尺的总面积。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号