首页> 外文期刊>Occupational medicine >Diego Rivera. Detroit Industry (1932-1933): north wall fresco, lower panel 5.398 m x 13.716 m. Detroit Institute of Arts, Detroit, USA.
【24h】

Diego Rivera. Detroit Industry (1932-1933): north wall fresco, lower panel 5.398 m x 13.716 m. Detroit Institute of Arts, Detroit, USA.

机译:迭戈·里维拉(Diego Rivera)。底特律工业(1932-1933):北壁壁画,下面板5.398 m x 13.716 m。美国底特律底特律艺术学院。

获取原文
获取原文并翻译 | 示例
       

摘要

This massive mural >22 feet high and 73 feet wide is bursting with life, energy and power. It depicts engine and transmission production for the 1932 Ford V8 at the Ford River Rouge factory in Detroit, an 'ore to assembly' complex employing 100 000 people on 1200 acres [1]. In the upper section, foundry operations are shown in sequence. A blast furnace is being tapped, while ladles of molten steel are filled, conveyed and emptied. The centre of the panel is occupied by two rows of giant multiple spindle drills, which ream out engine blocks and tower over the straining figures on the engine assembly line. Overhead conveyors traverse the composition like a giant circulatory system [2]. At the bottom of the mural, small Renaissance style monochrome predella panels depict various steel-making processes in 'a day in the life' of a' worker at the plant. The fresco is signed and dated 1 March 1933 [3].
机译:巨大的壁画高22英尺,宽73英尺,充满着生命,能量和力量。它描绘了1932年福特V8在底特律的福特河胭脂工厂生产的发动机和变速箱,这是一个“从装配到组装”的综合大楼,在1200英亩的土地上拥有10万名员工[1]。在上部,按顺序显示铸造厂的操作。高炉正在被攻丝,钢包被填充,输送和倒空。面板的中心被两排巨型多轴钻占据,这些钻钻出发动机缸体,并耸立在发动机装配线上的应变图中。架空的输送机像巨大的循环系统一样横越成分[2]。在壁画的底部,小小的文艺复兴时期风格的单色predella面板描绘了工厂“工人的一天”中的各种炼钢过程。壁画签名并注明日期为1933年3月1日[3]。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号