首页> 外文期刊>Russian Journal of Non-Ferrous Metals >PLAN FOR TESTING OF DOWN-HOLE LEACHING OF THE ERDENETIIN-OVOO COPPER ORES
【24h】

PLAN FOR TESTING OF DOWN-HOLE LEACHING OF THE ERDENETIIN-OVOO COPPER ORES

机译:ERDENETIIN-OVOO铜矿井下浸出测试计划

获取原文
获取原文并翻译 | 示例
           

摘要

The working plan for the trial leaching of the ores in the Tsentralnyi Sector of the Erdenetiin-Ovoo Deposit (Mongolia) was completed in 1999 at VNIPIpromtekhnologii (All-Union Scientific/Research Institute of Industrial Technology Planning) with the participation of the specialists of ZAO VNEShMET.The operations that were outlined in the plan are being conducted in the framework of the first stage of the implementation of the underground leaching (UL) technology. Upon obtaining positive results, the second stage will be the experimental/industrial exploitation of a representative segment of the Tsentralnyi Sector, followed by transition to the third stage - the commercial operation of this and possibly other segments of the deposit.
机译:Erdenetiin-Ovoo矿床(蒙古)的Tsentralnyi矿区的矿石的实验浸出工作计划于1999年在VNIPIpromtekhnologii(全联盟工业技术计划科学研究所)完成,ZAO的专家参加VNEShMET。计划中概述的操作是在实施地下浸出(UL)技术的第一阶段的框架中进行的。在获得积极成果之后,第二阶段将是对Tsentralnyi部门的代表性部分进行实验/工业开发,然后过渡到第三阶段-该矿床以及该矿床其他部分的商业运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号