...
首页> 外文期刊>Remediation: The Journal of Environmental Cleanup Costs, Technologies & Techniques >Accelerating Environmental Cleanup at DOE Sites: Monitored Natural Attenuation/Enhanced Attenuation - A Basis for a New Paradigm
【24h】

Accelerating Environmental Cleanup at DOE Sites: Monitored Natural Attenuation/Enhanced Attenuation - A Basis for a New Paradigm

机译:加速DOE站点的环境清洁:受监控的自然衰减/增强衰减-新范式的基础

获取原文
获取原文并翻译 | 示例

摘要

The U.S. Department of Energy is conducting a project to accelerate remediation through the use of monitored natural attenuation and enhanced attenuation for chlorinated ethenes in soils and groundwater. Better monitoring practices, improved scientific understanding, and an advanced regulatory framework are being sought through a team effort that engages technology developers from academia, private industry, and government laboratories; site cleanup managers; stakeholders; and federal and state regulators. The team works collaboratively toward the common goals of reducing risk, accelerating cleanup, reducing cost, and minimizing environmental disruption. Cutting-edge scientific advances are being combined with experience and sound environmental engineering in a broadly integrated and comprehensive approach that exemplifies so-called "third-generation R&D." The project is potentially a model for other cleanup activities.
机译:美国能源部正在实施一个项目,该项目通过使用监测的自然衰减和土壤和地下水中氯化乙烯的增强衰减来加速补救。通过团队合作,寻求学术界,私营企业和政府实验室的技术开发人员的更好的监控做法,增强的科学理解和先进的监管框架。现场清理经理;利益相关者;以及联邦和州的监管机构。该团队为实现降低风险,加快清理工作,降低成本和最小化环境破坏的共同目标而共同努力。尖端的科学进步与经验和完善的环境工程相结合,以一种广泛集成且全面的方式进行了例证,即所谓的“第三代研发”。该项目可能是其他清理活动的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号