首页> 外文期刊>Railway Technical Review >Modern high-speed points
【24h】

Modern high-speed points

机译:现代高速点

获取原文
获取原文并翻译 | 示例
           

摘要

The upgraded railway line between Hamburg and Berlin incorporates 132 points. One of the jobs to be done during the second phase of the upgrading work involved replacing these points or retrofitting them with high-speed technology. This had to be done round the clock in normal operating conditions - in other words generally during possessions. All these points or their individual parts were supplied by a company called BWG (in full: BWG Gesellschaft mbH & Co), which also provided support for their installation. Some of the novel high-speed point components are also described in detail in this article.
机译:汉堡和柏林之间的升级铁路线包含132个点。升级工作第二阶段要完成的工作之一是替换这些点或使用高速技术对其进行翻新。必须在正常操作条件下(即换句话说,通常在拥有时)全天候进行操作。所有这些点或它们的各个零件均由一家名为BWG的公司提供(全称:BWG Gesellschaft mbH&Co),该公司还为其安装提供支持。本文还详细介绍了一些新颖的高速点组件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号