首页> 外文期刊>NGW's Gas Market Reconnaissance >El Paso reports that the expansion of the Elba Island LNG terminal in Georgia has been completed and a new adjoining gas pipeline is now in service.
【24h】

El Paso reports that the expansion of the Elba Island LNG terminal in Georgia has been completed and a new adjoining gas pipeline is now in service.

机译:埃尔帕索(El Paso)报告说,佐治亚州的厄尔巴岛(Elba Island)液化天然气接收站的扩建工作已经完成,一条新的毗邻天然气管道正在使用中。

获取原文
获取原文并翻译 | 示例
       

摘要

The Elba Island LNG terminal now has a send-out capacity of 1.75 billion cubic feet of natural gas per day, up from 1.2 Bcfd previously. El Paso also reported that the newly built Elba Express Pipeline, a 190-mile pipeline with a capacity to transport 945 million cubic feet per day, will transport additional gas from Elba Island to southeastern and eastern US markets.
机译:厄尔巴岛的液化天然气接收站现在每天的天然气输出量为17.5亿立方英尺,高于之前的1.2 Bcfd。埃尔帕索(El Paso)还报告说,新建的Elba Express Pipeline是一条190英里长的管道,每天可输送9.45亿立方英尺的天然气,将从Elba岛向美国东南部和东部市场输送更多的天然气。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号